PEB
Design Drawing Supply & Installation of Pre-Fabricated Steel Structure Design Drawing Supply & Installation of Truss Type Steel Structure
Design Drawing Supply & Installation of Pre-Fabricated Steel Structure Design Drawing Supply & Installation of Truss Type Steel Structure
Architectural Design & Drawing with Interior. Structural Design & Drawing (Steel & RCC, ETP, Industrial Plant). Plumbing & Sanitary Design & Drawing. Electrical Design & Drawing. Mechanical Design & Drawing. BMS (Building Management System)
Coffer Dam of Under Water Construction Work Unifloat (Pontoon) Steel Tank Steel Frame Jetty. Expansion Joint of Bridge
Bridges with PC Girders & Deck Girders. Construction of Jetty. Excavation Work. Building Construction.
➢ Supply of Sheet Pile (SP-II, SP-III, SP-IV) ➢ Driving & Extraction Using Vibratory Hammer (Hydraulic & Electric) ➢ Driving & Extraction Using Excavator Mounted Vibratory Hammer.
➢ Single drum winch ➢ Double drum winch ➢ Hydraulic Pile Driver
➢ Manufacturing of Pre-cast Pile. ➢ Hydraulic & Diesel Hammer.
Hydraulic Rotary Rig. Percussion Method. Mechanical Rotary Rig. Reverse Circulation Driving System (RCD) Skid Mounted Table Drive Rotary Boring
➢ Exploratory Boring. ➢ Laboratory Test. ➢ Earth Resistivity Test. ➢ Field Test. Soil investigation must be undertaken to determine the bearing capacity of the soil, its settlement rate and the position of the water